en/it

menu alto en

The Tunnels

TECHNICAL INFORMATION

width: 10,20 meters;

length: 290,26 meters;

height: 6,36 meters;

surface area: 2.960,65 square meters;

volume: 18.433,39 cubic meters;

amount of material removed: +/- 190.000 cubic meters;

amount of asphalt for roadway surface: +/- 520 tons;

amount of concrete: +/- 1.500 cubic meters;

amount of iron rebar: +/- 45.000 kilos.

The Trento Tunnels are just what the name suggests: two former highway tunnels reconverted into a history museum. They were built in the early 1970s to permit the speedy traversal of the city along the provincial North-South highway, running from Verona to the Brenner Pass, as part of the development of the Trento ring road.

They are less a museum than a space dedicated to history. A space primarily devoted to the local and regional: to be precise, to the Trentino’s history and population, to the reasons for its autonomy.

But without forgetting broader horizons: other histories, both larger and smaller.

 

 

 

 

 

 

 

application/pdf iconThe Tunnel
Works